My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-12_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2018-10-12_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 7:11:26 AM
Creation date
11/7/2018 7:03:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/12/2018
Doc Name
Correspondence
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
TR84
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />Twentymile Coal (TC), the current operator of the Foidel Creek Mine (the mine) located in northwest Colorado, has <br />developed and is proceeding with mining of a coal seam which underlies previously mined areas. These mining activities <br />will require drainage and treatment of water which has accumulated in the previously mined areas to remove mine water <br />contaminants including iron, sulfate and total dissolved solids. TC intends to pump the mine water through a passive <br />treatment system to improve the water quality, as part of the mine water treatment and handling system. Passive <br />treatment systems have been shown to provide effective treatment of similar composition in other applications. TC had <br />requested CH2M HILL (CH2M) to complete a conceptual study on passive treatment alternatives in December 2015. This <br />study, "Twentymile Coal Mine Discharge Passive Treatment Evaluation" referenced in Appendix A, had identified that a <br />constructed free water surface wetland system consisting of five cells in series, including the 61VIN Pond as the final <br />polishing cell, would provide cost effective removal of mine water contaminants. At the conclusion of the treatment <br />project, the wetland area would be removed and reclaimed, although TC is further evaluating the potential to retain the <br />wetlands to continue to function passively as a wildlife habitat, fed by natural precipitation and runoff. <br />The 2016 design ran into permitting obstacles that ultimately required the system to be moved to anew location. CH2M <br />HILL was asked to update the system to conform to the new location while making minimal changes to the design. In <br />general, the basis of design factors that influence sizing of the system remained similar or in most case led to the original <br />design being conservatively sized. The system modeling for cell sizing and hydraulics remained as completed in the 2016 <br />design. As a new location, TC will need to verify the characteristics of the foundation and construction materials, although <br />given proximity and similar topography, it is reasonable to assume that they will be very similar to the original location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.