Laserfiche WebLink
maximum recommended for access and maintenance, satisfies all slope stability design criteria. Factors of <br />safety (FOS) for the various stability analysis conditions are provided in Table 6. <br />Table 3-2: Computed Factors of Safety of 3H:1V <br />Upstream and Downstream Stopes for Considered Analysis Conditions <br />Analysis Condition Slope Factor of Safety Design Criteria <br />(Minimum Fos) <br />End -of -construction Interior 1.89 1.3 <br />End -of -construction Exterior 157 1.3 <br />Steady-state seepage Exterior 2.23 1.5 <br />Pseudostatic seismic stability Exterior 1.91 1.0 <br />3.3 Geotechnical Recommendations <br />3.3.1 Borrow Suitability <br />Based on the observed field conditions during the test pitting program, the soil graded gradually from <br />residual clay soils appropriate for embankment fill material to the shale bedrock below. In all but one <br />test pit, the transition from clay to shale was encountered at a depth of 4 to 8 feet. Within the transition <br />zone, an intermediate weathered weak shale was encountered that crumbled easily to a clay rich soft <br />gravel type material that does not compact to a water tight material in the same way as the clay soil <br />above. The material used as borrow for the embankment should be restricted to the overlying clay soil, <br />and not extend to include the intermediate material that crumbles into a clay rich material. <br />3.3.2 Embankment Foundation Preparation <br />The impoundment site is currently covered with grass. In addition, the uppermost 6 to 12 inches of the <br />soil profile contains soil with organic matter that is unsuitable for embankment construction. <br />Embankment foundation preparation will require stripping of the surface vegetation (roughly 6 inches) <br />for disposal. The removed topsoil can be stockpiled for use as topsoil upon completion of the <br />embankment. <br />3.3.3 Embankment Lining <br />Prior to the geotechnical investigation, the conceptual study proposed that the constructed wetlands would <br />be lined with high density polyethylene (HDPE) geomembrane. However, results from the investigation have <br />identified that a clay liner will be suitable for this application to prevent leakage of water through the berms <br />and bottom and to maintain separation of residuals within the passive treatment systems. <br />For clay lined impoundments, it was determined that the maximum recommended permeability of materials <br />used as fill is 1 x 10' cm/s. Based on the results of testing conducted in 2007 and the index properties of the <br />materials tested within the project footprint in 2016, properly compacted borrow material is expected to <br />meet permeability requirements. In addition, the native clay and shale underlying the proposed <br />impoundments both have low permeability. <br />Practical methods for ensuring adequate permeability performance include the following design <br />considerations: <br />• Construct the homogeneous embankment from clay compacted to 95% of standard proctor <br />maximum density at a moisture content ranging from 1 point below to 3 points above optimum <br />moisture content. <br />PEABODY-FINAL_DESIGN_TM-20181010 !-i <br />COPYRIGHT 2012 BY CH2h6 HILL INC.. COMPANY CONFIDENTIAL <br />