Laserfiche WebLink
11/7/2018 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel Creek Mine (C-82-057), TR1 6-84 Revised Maps <br />STATE OF DRIVIS CoalAdmin - DNR, DNR <dnr drms_coal_admin@state.co.us> <br />COLORADO <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />Fwd: Twentymile Coal, LLC - Foidel Creek Mine (C-82-057), TR16-84 Revised Maps <br />1 message <br />Lynch - DNR, Tabetha <tabetha.lynch@state.co.us> Tue, Nov 6, 2018 at 2:25 PM <br />To: DNR DRMS—CoalAdmin - DNR <dnr—drms—coal—admin@state.co.us> <br />C1982056 TR84 Correspondence <br />---------- Forwarded message --------- <br />From: Nettleton, Jerry <JNettleton@peabodyenergy.com> <br />Date: Fri, Oct 12, 2018 at 2:55 PM <br />Subject: RE: Twentymile Coal, LLC - Foidel Creek Mine (C-82-057), TR16-84 Revised Maps <br />To: Lynch - DNR, Tabetha <a betha. lynch @state. co. us> <br />Attached is the revised design report (includes the revised drawings) with PE certification. Please replace in the most <br />recent TR submittal package. Thanks! <br />From: Nettleton, Jerry <br />Sent: Friday, October 05, 2018 2:07 PM <br />To: 'Lynch - DNR, Tabetha' <br />Subject: RE: Twentymile Coal, LLC - Foidel Creek Mine (C-82-057), TR16-84 Revised Maps <br />I am still waiting on the final design report with PE stamp (hopefully Monday), and will forward on receipt. The <br />revised design report will replace the original design report, with the updated drawings (will be the same as provided <br />on 09/24), and some minor changes in material volumes, but no substantive change in the basic design or the <br />hydrologic and treatment analyses. At this point, you should have everything you need for review, and any minor <br />changes in the final design report or related questions can be addressed through the adequacy review process — <br />https:llmail.google.com/mail/b/AK4ApiZciBMigoWzTVjFzGnGjzgOpWC7KifR4uQ50XTMOufngOqy/u/0/?ui=2&ik=deb7fOcd2O&jsver=abMmoXjbiOA.en.... 1/4 <br />