My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-06_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2018-11-06_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 2:34:59 PM
Creation date
11/6/2018 1:49:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
11/6/2018
Doc Name Note
Construct road to lower level of Upper Pit
Doc Name
Request for Technical Revision
From
American Gypsum Company, LLC
To
DRMS
Type & Sequence
TR11
Email Name
SJM
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Pit 6900 Access Road I Design Summary American Gypsum <br /> U.S. Department of the Interior Bureau of Land Management (BLM), 2002. Letter to Steve <br /> Onorofskie from Steve Bennett, Acting Field Manager, 25 September 2002. <br /> U.S. Department of the Interior Bureau of Land Management (BLM), 2015. Colorado River <br /> Valley Field Office Record of Decision and Approved Resource Management Plan, <br /> Appendix K, Best Management Practices and Conservation Measures. June 2015. <br /> United States Geologic Survey (USGS), 2018. Geologic Hazard Map <br /> https://earthquake.usgs.gov/hazards/interactive/index.php. Viewed 29 March 2018. <br /> This memorandum has been prepared for the exclusive use of American Gypsum for specific application to the area <br /> within this memorandum.Any use which a third party makes of this memorandum,or any reliance on or decisions made <br /> based on it, are the responsibility of such third parties. Tierra Group International, Ltd. accepts no responsibility for <br /> damages, if any, suffered by any third party as a result of decisions made or actions based on this memorandum. It <br /> has been prepared in accordance with generally accepted engineering practices. No other warranty, expressed or <br /> implied, is made. <br /> AG Upper Pit 6900 Access Rd 20181015 October 2018 Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.