Laserfiche WebLink
✓,l J� �- Ac'W ' l <br /> WASThLINE IN(s�Cy . <br /> P.O. Box 3471 Rapid City, SD 57709-3471 (605)939-0650-P.O. Box 88 Cortez,CO 81321-0088 ••• <br /> 198 N 200 E Unit#1 Moab, UT 84532-3201 Latham Ave Evans, CO 80620 <br /> E-mail:WASTELINE.84532@gmail.com <br /> 01 November 2018 <br /> Mr. Lucas West, Environmental Protection Specialist <br /> AND Ms. Barbara Coria, Financial Specialist RECEIVED <br /> Division of Reclamation Mining and Safety <br /> 1313 Sherman Street Room 215 NOV 0 ,.: 2018 <br /> Denver, CO 80203 <br /> 1 of Reclama iron <br /> Subject: Request for additional time, Amzak Pit, M2003-003 Succession of Operators Milling&Safety <br /> Dear Mr. West: <br /> Since our last request and approval of an extension (to Monday, 05 November 2018), <br /> the following has happened: <br /> 1. We requested agreements from Atmos Energy, Atom Petroleum, and Terra Exploration <br /> and Product, all possible owners of the fenced pad (and associated equipment) on the <br /> western edge of the permitted area, on CR-136: <br /> a. The USPS was unable to deliver the request to Terra, which is, as suspected, <br /> completely out of business. <br /> b. The request was delivered by USPS to Atom, but signature was refused to be <br /> given, and there has been no response. <br /> c. The request was delivered by USPS to Atmos, and we were contacted by their <br /> local (La Plata County) supervisor, who reported that the firm's attorneys were <br /> looking at it and would not contact me. They have not done so. <br /> 2. In addition (as discussed earlier), Atmos Energy offered to sell their rights to the real <br /> estate and equipment to Mr. Robert P. Johnson, who originally granted the easement. <br /> However, Mr. Johnson transferred the property to Durango PTR Properties, LLC, for <br /> which he is agent and I believe, owner. I forwarded the offer documents to Mr. Johnson <br /> through Dawn Richardson, with the recommendation that Mr. Johnson deal directly with <br /> Atmos. We have heard nothing since then. <br /> 3. As we have discussed, and I understand the situation, we have not yet been able to <br /> resolve this first (updated documentation regarding significant manmade structures) of <br /> the two items necessary to complete the Succession of Operator of the Amzek Pit from <br /> Consolidated Constructors to Richardson Construction Kemble Excavation JV(RCKE): <br /> 4. Mrs. Richardson also requested updated third-party financial warranty documents, from <br /> Consolidated Constructors. Mrs. Richardson has not yet been given those. This is the <br /> second of the two items necessary. <br /> 5. I have prepared an engineering assessment, as we discussed, and it is my professional <br /> opinion that none of the mining activities have any impact on the structural stability or <br /> condition of the equipment and site (including access roads and fencing) which is <br /> presently (apparently) in the possession of Atmos Energy. <br /> But we have again hit the deadline for completing these actions, and while progress has <br /> been made, we need an additional extension. This letter requests another extension to that <br /> deadline, to Wednesday, 05 December 2018 (30 days), and asking for the Division to allow <br /> submission of the engineering evaluation which I have prepared, having met the requirements <br /> for requesting such from all known possible owners and having received no response. <br /> Respectfully, <br /> Nathan A. Barton, CE, PE, DEE <br /> CF: RC, KE Project file: 5174.1 <br />