My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-02_PERMIT FILE - M2018037 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018037
>
2018-11-02_PERMIT FILE - M2018037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 1:27:23 PM
Creation date
11/6/2018 10:03:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018037
IBM Index Class Name
PERMIT FILE
Doc Date
11/2/2018
Doc Name Note
Final Adequacy Responses
Doc Name
Adequacy Review Response
From
Civil Resources, LLC
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D— MINING PLAN <br /> This information provided in this Exhibit is intended to satisfy the requirements outlined in Section <br /> 6.4.4 of the Colorado Mined Land Reclamation Board Construction Material Rules and <br /> Regulations: <br /> (a) Description of the method(s)of mining to be employed in each stage of the <br /> operation as related to any surface disturbance on affected lands; <br /> The proposed permit area includes a significant deposit of sand and gravel located in <br /> the alluvium of the South Platte River in Weld County. The site is located south of <br /> Weld County Road 14.5 and is west of Highway 85. It encompasses.127acres +1-. <br /> /do <br /> Site Preparation: <br /> Initial disturbance of the property will include: clearing the site of existing structures <br /> (with exception of the structures to remain), constructing the slurry wall, dewatering the <br /> site, and stripping the topsoil and overburden material. <br /> Mining: <br /> After the slurry wall installation, dewatering trenches will be excavated down to <br /> bedrock to dewater the portion of the site located within the slurry wall. Groundwater <br /> collected in the dewatering trench will be pumped into a settling pond and ultimately <br /> discharged to the South Platte River located initially on the east end of the property <br /> and eventually on the west end of the property. Once water levels are controlled <br /> through the dewatering system, scrapers will strip the topsoil and overburden material <br /> from a given phase and stockpile them separately for use during site reclamation. Any <br /> excess material not needed for reclamation may be sold or hauled off-site during the <br /> life of the mine. <br /> The sand and gravel material will be excavated down to bedrock. Each phase will be <br /> dry-mined using scrapers, bulldozers,front-end loaders, excavators, or similar <br /> equipment. The mining on this site will progress in four phases, ranging in size from <br /> 20-25 acres and proceeding from west to the east. <br /> The operator will develop and comply with a Stormwater Management Plan and Spill, <br /> Prevention, Control and Countermeasures Plan. The operator will notify the Division <br /> • of Reclamation and Mine Safety and in the event of a reportable spill. <br /> Processing: <br /> All material mined under this proposed application will be transported by conveyor or <br /> haul truck to the processing area. The processing area will be located on the west <br /> side of the site for the entire project. Once mining of that area has ceased the <br /> processing plant will be moved to the east side of the site. <br /> Burnco Colorado, LLC—Inouye Gravel Mine—MLRB 112 Permit Application <br /> Exhibit D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.