Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 6 of 144 <br />Brazell -Simms <br />60'x40'xl5' <br />Bldg. (MN) <br />36,000.00 <br />CF <br />$0.22 <br />$7,776.00 <br />Building <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x192 <br />Demo. and on- <br />192.00 <br />LF <br />$3.58 <br />$687.36 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />-Pad <br />60'x40'x4" <br />Demo. and on- <br />2,400.00 <br />SF <br />$0.57 <br />$1,365.60 <br />site disposal in <br />excavated pit, <br />4 in. thick - <br />Max. 200 ft. <br />push <br />No. 9 Portal <br />24'x50'xl2' <br />Bldg. (MN) <br />43,200.00 <br />CF <br />$0.22 <br />$9,331.20 <br />Warehouse/Bathhouse <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x420 <br />Demo. and on- <br />420.00 <br />LF <br />$3.58 <br />$1,503.60 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />Reclamatin <br />70'x100'xl5' <br />Bldg. (MN) <br />105,000.00 <br />CF <br />$0.22 <br />$22,680.00 <br />Building(Pole Barn) <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x334 <br />Demo. and on- <br />334.00 <br />LF <br />$3.58 <br />$1,195.72 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />-Pad <br />1'x2'x4" <br />Demo. and on- <br />7,000.00 <br />SF <br />$0.57 <br />$3,983.00 <br />site disposal in <br />excavated pit, <br />4 in. thick - <br />Max. 200 ft. <br />push <br />500 Gallon Antifreeze <br />500 Gallons <br />Comprehensive <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5 Fuel Island <br />storage tank <br />removal, non - <br />leaking - 3,000 <br />to 5,000 gal. <br />tank <br />8000 Gallon Diesel <br />8000 <br />Comprehensive <br />1.00 <br />EA <br />$5,286.80 <br />$5,286.80 <br />Fuel Tank; #5 Fuel <br />Gallons <br />storage tank <br />Island <br />removal, non - <br />leaking - 6,000 <br />to 8,000 gal. <br />tank <br />2000 Gallon Oil <br />2000 <br />Comprehensive <br />1.00 <br />EA <br />$5,286.80 <br />$5,286.80 <br />Tank; #5 Fuel Island <br />Gallons <br />storage tank <br />CIRCES Cost Estimating Software <br />