Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Cat D9T - 9SU <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.666 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3239 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />683.59 LCY/hr <br />683.59 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.383/LCY <br />Total job time: 2.60 Hours <br />Total job cost: $680 <br />Task description: <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Pond 9-P3 <br />Permit Action: RN7 <br />Task #: 037 State: Colorado <br />Date: 10/30/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $110.70 NA <br />Operating Cost/Hour: $95.46 100 <br />Ripper own. $14.21 NA <br />Cost/Hour: <br />Page 61 of 144 <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: 037 <br />CIRCES Cost Estimating Software <br />