Laserfiche WebLink
Demo Worksheet Cont'd <br />Unit cost: $92.09 per acre <br />Task description: <br />Site: Williams Fork Mines <br />Task # TTT Page 47 of 144 <br />Total job cost: $1,906 <br />MOTOR GRADER WORK <br />Finish Grade Portal No. 5A Area <br />PROJECT IDENTIFICATION <br />Permit Action: RN7 <br />Task #: 026 State: Colorado <br />Date: 10/30/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: 026 <br />HOURLY EQUIPMENT COST <br />1.50 <br />mph <br />Basic Machine: CAT 14M <br />Finish grading <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank <br />Ripper <br />Shift Basis: 1 per day <br />Effective Blade Length: <br />12.10 <br />Data Source: (CRG) <br />Cost Breakdown: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />Utilization % <br />Ownership Cost/Hour: <br />$60.13 <br />NA <br />Operating Cost/Hour: <br />$50.87 <br />100 <br />Ripper Ownership Cost/Hour: <br />$4.07 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$28.69 <br />NA <br />Total Unit Cost/Hour: <br />$143.75 <br />Total Fleet Cost/Hour: $143.75 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />26.50 <br />Exhibit 23, page 4 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading <br />(0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5400 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.5609 <br />Adjusted Hourly Fleet Production: 1.5609 <br />JOB TIME AND COST <br />acres/Hour <br />acres/Hour <br />CIRCES Cost Estimating Software <br />