My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-01_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2018-11-01_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 11:57:04 AM
Creation date
11/5/2018 9:04:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
11/1/2018
Doc Name
Cost Estimate
From
Tabetha Lynch
To
Robin Reilley
Type & Sequence
RN7
Email Name
TNL
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 45 of 144 <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper Push Dozer Source <br />Roll. Res <br />(%) <br />Altitude Ad': <br />1.000 NA CAT HB <br />Job Efficiency: <br />0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />2460.00 7.50 <br />3.00 <br />10.50 <br />922 <br />2.70 <br />2 <br />940.00 6.00 <br />3.00 <br />9.00 <br />1042 <br />0.91 <br />Haul Time: 3.61 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />940.00 <br />-6.00 <br />3.00 <br />-3.00 <br />2972 <br />0.39 <br />2 <br />2460.00 <br />-7.50 <br />3.00 <br />-4.50 <br />2972 <br />0.87 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 537.87 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.653 /LCY <br />1.26 <br />minutes <br />6.47 <br />minutes <br />446.43 <br />LCY/Hour <br />2 <br />Scraper(s) <br />446.43 <br />LCY/Hour <br />446.43 <br />LCY/Hour <br />Total job time: 2.80 Hours <br />Total job cost: $2,066 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.