My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-01_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2018-11-01_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 11:57:04 AM
Creation date
11/5/2018 9:04:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
11/1/2018
Doc Name
Cost Estimate
From
Tabetha Lynch
To
Robin Reilley
Type & Sequence
RN7
Email Name
TNL
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Pagc 34 of 144 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Refuse Pile <br />Site: Williams Fork Mines Permit Action: RN7 Permit/Job#: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 019 State: Colorado <br />Date: 10/30/2018 County: Moffat <br />User: TNL <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: 019 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $738.04 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 110 Y [IN <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$165.84 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$172.14 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.05 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$369.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$738.04 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $738.04 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 110 Y [IN <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.