Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 (] <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.115 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.5009 <br />Adjusted unit 249.10 LCY/hr <br />production: <br />Adjusted fleet 996.4 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.247/LCY <br />Total job time: 0.47 Hours <br />Total job cost: $589 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 99 of 144 <br />CIRCES Cost Estimating Software <br />