Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 8 of 144 <br />Portal MSB Fuel <br />to 8,000 gal. <br />Island <br />tank <br />1000 Gallons <br />1000 <br />Comprehensive <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Emulsion &Water <br />Gallons <br />storage tank <br />Tank; #5a Mine <br />removal, non - <br />Portal MSB Fuel <br />leaking - 3,000 <br />Island <br />to 5,000 gal. <br />tank <br />10000 Gallons <br />10000 <br />Comprehensive <br />1.00 <br />EA <br />$7,608.95 <br />$7,608.95 <br />Chemical Storage; <br />Gallons <br />storage tank <br />#5a Mine Portal MSB <br />removal, non - <br />Fuel Island <br />leaking - 9,000 <br />to 12,000 gal. <br />tank <br />1000 Gallons Oil <br />1000 <br />Comprehensive <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5a Mine <br />Gallons <br />storage tank <br />Portal MSB Fuel <br />removal, non - <br />Island <br />leaking - 3,000 <br />to 5,000 gal. <br />tank <br />500 Gallon Antifreeze <br />500 Gallons <br />Comprehensive <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5a Mine <br />storage tank <br />Portal MSB Fuel <br />removal, non - <br />Island <br />leaking - 3,000 <br />to 5,000 gal. <br />tank <br />Rock Dust Tank; <br />8'D x 20' <br />Bldg. (MN) <br />1,005.00 <br />CF <br />$0.22 <br />$217.08 <br />Empire Village <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />2 Rock Dust Tanks; <br />8'D x 20' <br />Bldg. (MN) <br />2,010.00 <br />CF <br />$0.22 <br />$434.16 <br />Shop area <br />(2) <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />Rock Dust Tank; #5A <br />8'D x 20' <br />Bldg. (MN) <br />1,005.00 <br />CF <br />$0.22 <br />$217.08 <br />Portal Area <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />Bathouses Near Mine <br />24'x 50' <br />Bldg. (SN) <br />43,200.00 <br />CF <br />$0.20 <br />$8,510.40 <br />Office (Men's, <br />x12 (3) <br />demo./on-site <br />Womens and Visitor <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />No. 5 Mine Conveyor <br />380 LF (?) <br />Conveyor, <br />6.00 <br />EA <br />$2,825.00 <br />$16,950.00 <br />Horizontal Belt <br />24" Belt, 61.5' <br />Length <br />No. 5A Conveyor and <br />120 LF <br />Conveyor, <br />2.00 <br />EA <br />$2,825.00 <br />$5,650.00 <br />Transfer (Mine <br />Horizontal Belt <br />Overland) <br />24" Belt, 61.5' <br />Length <br />48 -Inch Overland <br />1712 LF <br />Conveyor, <br />28.00 <br />EA <br />$2,825.00 <br />$79,100.00 <br />Conveyor (MIne <br />Horizontal Belt <br />Overland) <br />24" Belt, 61.5' <br />Length <br />CIRCES Cost Estimating Software <br />