3.1.2 Reclaiming Substituted Land: <br /> The Applicant/Operator does not intend to substitute other land for reclamation. <br /> 3.1.3 Time Limit and Phased Reclamation: <br /> Reclamation will be done in phases as discussed in section 6.4.5(2) (a)above and Table 1. <br /> 3.1.4 Public use: <br /> The mine site is private land owned by the Town of Limon. The Town of Limon has no intent to <br /> allow public use of the land during mining and site reclamation. <br /> 3.1.5 Reclamation Measures—Materials Handling: <br /> (1) Grading: <br /> Little site grading will be needed since the intent is to final mine the pits slopes at 3H:1 V. Also, <br /> please see 3.1.5(3)below. <br /> (2) Backfilling: <br /> We do not expect there will be slopes needing backfill. The intent is to final mine all slopes as <br /> stated in 3.1.5 (1)above. We will have an overburden stockpile that will be available for <br /> backfilling slopes or transported off-site as needed. We anticipate an overburden stockpile of <br /> approximately 2,000 cubic yards. <br /> (3) All grading shall be done in a manner to control erosion and siltation of the <br /> affected lands,to protect areas outside the affected land from slides and other damage: <br /> The practice of mining the slopes to the final grade, into undisturbed ground,tends to minimize <br /> slope erosion and failure. Therefore,the potential for off-site slope failure or erosion should be <br /> minimal. <br /> The pit floors will be final graded at approximately 1.5 %or less away from the toe of the final <br /> slopes,toward the nearest drainage. This will ensure no ponding of rain or snow melt,yet prevent <br /> excessive site erosion. <br /> (4) The Operator shall establish reasonable timetables consistent with good mining <br /> and reclamation Procedures: <br /> We believe the mining and reclamation phases (timetable)discussed above will reduce the <br /> potential for the reclaimed areas being re-disturbed. <br /> 28 <br />