Laserfiche WebLink
• During the reclamation process initial step is topsoil immediately followed by <br /> hydromulching. <br /> • Due to hydromulching there will be no need for mulching or crimping. <br /> • Due to small size of site hand tools including hoe, rake and pick utilized to break up <br /> compacted122 soil areas. <br /> • Site roads _ .luded in the reclamation pla <br /> • Some areas may require Jute Net utilized as best practice. Jute Net is estimated at 0.25 <br /> Acres. <br /> • Berms are a minimum of mid axle height of the largest self- propelled mobile equipment <br /> which usually travels the roadway. <br /> • Berms consist of rock, sandy loam and topsoil. <br /> • Trenched area re-filled with waste/wall rock and lastly top soil then replanted on an <br /> ongoing basis during the mining process. <br /> • Due that roads and reclaimed trench are to remain as fire breaks these areas will not be <br /> replanted with shrubs or trees. <br /> • Teton Drilling Inc. is not reclaiming any of the existing disturbances shown on the <br /> Existing Disturbances Map. <br /> Estimate of actual costs to reclaim the site with no Crusher and Wash Plant per previous plan: <br /> Description: Price: <br /> Equipment Costs $1,600 <br /> Fuel $400 <br /> Trucking and Hauling <br /> Charges $800 <br /> Labor $1,200 <br /> Reseeding $650 <br /> Misc. (Jute Nets, Hay <br /> Bails, etc.) $350 <br /> Total $5,000 <br /> Teton Drilling Inc. <br /> Dixie Mine-Clear Creek County,CO <br /> Updated Revisions—October 30,2018 <br /> Page I 8 <br />