Laserfiche WebLink
4 | Page <br /> <br /> Figure 2 - Pond 1, stable and fully functional at the time of inspection. <br /> <br /> Figure 3 - The Emergency Spillway, well made of a <br />concrete blanket, had a berm with a pvc pipe <br />embedded at the time of inspection. This is most <br />likely the NPDES Sample Point 2.