My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-26_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2018-10-26_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:21:25 AM
Creation date
10/29/2018 1:46:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
REVISION
Doc Date
10/26/2018
Doc Name
Adequacy Review
From
AuPt Industries
To
DRMS
Type & Sequence
TR1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17)(Optional) Please provide additional information about the Mine Plan: <br /> Strips will be cut on the 9.9 acre permitted area,with a maximum of 1.5 acre disturbed during mining phases with a <br /> maximum disturbance of 2.5 acres including processing areas,ponds,roads,etc.Material will be excavated and stockpiled <br /> in previous disturbed area adjacent to cuts and run through portable wash-plant.Topsoil,will be stockpiled at the western <br /> end of each cut.Tailings from washplant will then be moved back to the mined cut.Mining will commence in a direction <br /> from North to South,filling cuts with tailings and moving on. Upon completion disturbed area will be graded and restored <br /> to previous contours.An excavator and front loader will be used for the excavation and processing.Hired excavator <br /> contractor will be used for grading. <br /> Including the following: <br /> (1)(b)Topsoil not immediately reclaimed to be covered w.erosion control blankets <br /> (d)Deposit averages 72'in depth <br /> (e)No permanent structures on site.Shipping containers will be used to house supplies,including workshop to maintain <br /> equipment and gold recovery.Mobile office and RV will be placed on previously disturbed ground. <br /> (f)Stripped ground will not exceed 100'in width and 600'in length.Stockpiled ore material will not exceed a 100'x100' <br /> footprint and tailings will also not exceed a 150'x100'footprint.Ongoing reclamation to follow immediately after running <br /> of the material through the washplant.Ponds will be placed at existing dam feature.Pond dimension(triangular) <br /> 60'x100'x120'with a depth of 8'(150,000 gallons).Pond will not use a liner,washing of the material creates a seal to hold <br /> the water.Only one pond will be open at a time.The north pond will be created first to cover the north section of mining. <br /> Once mining the north section will be complete,the north pond's water will be pumped over to create the south pond. <br /> (g)The mine will be accessed via an existing spur off of Moffat County Road 88.The spur is approximately 105'in length <br /> and 15'in width.No improvements to the this spur will be necessary.The spur accesses a previously worked pit. <br /> (h)The West Side Pâșacer will use approximately 12 acre feet of water per annum. <br /> (j)No injury to existing water rights,area is not appropriated.All water taken from the well will be placed back into the <br /> earth. <br /> (K)Rapid Thickener and Flocculant: <br /> The rapid thickener is a tank with a rotating rake that is designed to remove sediment,primarily clays and sub 200 mesh <br /> particles so that water can be recycled for continual process water use.See attached architectural diagrams and photos <br /> provided.Updated Mine Plan and Map reflect these changes. <br /> The rapid thickener dramaticallyreduces the water requirement for the West Side Placer.Water is constantly recycled.The <br /> thickener underflow,containing consumed flocculant is discharged into north water pond.The underflow is primarily clays <br /> and fine sand particles.The flocculant is biodegradable and non toxic.The discharge is reclaimed from the pond and added <br /> to processed materials for reclamation.The consumed flocculant is non toxic and biodegradable. <br /> The rapid thickener uses a non toxic flocculant-DAF 30.See attached MSDS.DAF 30 does not contain any hazardous <br /> components according to OSHA 29 CFR 1910.1200.The DAF 30 is diluted to 1 ppm after being introduced into a mixing <br /> tank and then into a holding tank that is used to inject the flocculant into the process water before the thickener. Mixing <br /> tank is 500 gallons,while holding tanks is 3000 gallons.Spills will be cleaned up with absorbent material and disposed of in <br /> accordance to all applicable laws. Dry flocculant is double contained and stored with a Connex shipping container. <br /> Additional Reclamation Fees <br /> Plugin of well-$3,739.00 <br /> Seedmix-($120 per acre x5)-$600 <br /> Till and Seeding($300 per acre x5)$1500 <br /> Demolition of Pond-$1500 <br /> ----------------------------------------------------------- <br /> 5,839.00 <br /> x 18.5% 6,919.22 <br /> Previous reclamation costs:7702.5 <br /> Total reclamation estimate: 14,621.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.