Laserfiche WebLink
REVEGETATION – Rule 4.15 <br />Vegetative Cover; Timing: <br />Hydroseeding along the Collom Haul Road embankments and road cuts were observed. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil placement was occurring along the north eastern end of the West Pit. Piles were observed to be staged <br />along the southern portion of the observed area while spreading has occurred along the northern portion. <br /> <br />Topsoil stripping along the Collom excess spoil pile footprint as well as the initial Collom boxcut area appears to <br />be occurring at the time of the inspection. Additional topsoil stripping was observed just east of the Collom rock <br />crusher facility. <br /> <br />Active shaping and grooming of topsoil piles in the Collom area were occurring during the inspection. Each <br />topsoil pile observed was contained with a ring ditch. No issues were observed. <br /> <br /> <br />Topsoil placement at West Pit. <br />