Laserfiche WebLink
PERMITTEE NAME/ADDRESS (include Facility Name/Location if Different) <br />NAME: <br />Blue Mountain Energy Inc <br />ADDRESS: <br />3607 CR 65 <br />EX <br />Rangely, CO 81648 <br />FACILITY: <br />DESERADO MINE <br />LOCATION: <br />3607 CR 65 <br />VALUE <br />RANGELY, CO 81648 <br />ATTN: ALAN HILLARD, MINE MGR <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) <br />DISCHARGE MONITORING REPORT (DMR) <br />000038024 029-A <br />PERMIT NUMBER DISCHARGE NUMBER <br />MONITORING PERIOD <br />MMIDDIYYYY MMIDD/YYYY <br />FROM 7/01/2018 TO 1 9/30/2018 <br />Form Approved <br />OMB No. 2040.0004 <br />DMR Mailing ZIP CODE: 81648 <br />MINOR <br />(SUBR DW) RBLAN <br />DISCHARGE TO RED WASH <br />External Outfall <br />No Discharges <br />PARAMETER <br />QUANTITY OR LOADING <br />QUALITY OR CONCENTRATIONNO• <br />EX <br />FREMENCY <br />OF ANALYSIS <br />SAMPLE <br />TYPE <br />VALUE <br />VALUE <br />UNITS <br />VALUE <br />VALUE <br />VALUE <br />UNITS <br />p H <br />MEASUREMENT <br />..„» <br />....„ <br />«•'•• <br />SU <br />0 <br />2/month <br />Insitu <br />0040010 <br />Effluent Gross <br />PERMIT <br />REQUIREMENT <br />6.5 <br />MINIMUM <br />""" <br />9 <br />MAXIMUM <br />SU <br />Twice Per <br />INSITU <br />Solids, total suspended <br />SAMPLE I <br />MEASUREMENT <br />„„„ <br />„„» <br />•„„• <br />•••,,, <br />mg/1 <br />0 <br />2/month <br />Grab <br />0053010 <br />Effluent Gross <br />PERMIT <br />REQUIREMENT <br />•""' <br />""'• <br />35 <br />30DA AVG <br />70 <br />MX 7D AV <br />mg/L <br />Twice Per <br />Month <br />GRAB <br />Solids, settleable <br />SAMPLE <br />MEASUREMENT <br />»»» <br />,..... <br />„„« <br />•...» <br />•••»• <br />mL/L <br />0 <br />2/month <br />Grab <br />0054510 <br />Effluent Gross <br />REQUIREMENT <br />...... <br />•«••• <br />DAILY MX <br />mUL <br />Twice Per <br />Month <br />GRAB <br />Iron, total (as Fe) <br />SAMPLE <br />MEASUREMENT <br />.„.„ <br />»„„ <br />»..» <br />„•••• <br />mg/1 <br />0 <br />2/month <br />Grab <br />0104510 <br />Effluent Gross <br />PERMIT <br />REQUIREMENT <br />»«« <br />"""' <br />...... <br />30DA AVG <br />DAILY MX�Month <br />Twice Per <br />GRAB <br />Oil and grease <br />SAMPLE I <br />MEASUREMENT <br />...•„ <br />,.„„ <br />„••„ <br />•»,» <br />••„„ <br />mg/1 <br />0 <br />Contingent <br />0358210PERMIT <br />Effluent Gross <br />REQUIREMENT <br />•".» <br />..".• <br />•"•» <br />.„"' <br />...„. <br />10 <br />INST MAX <br />mg/L <br />Contingent <br />GRAB <br />Flow, in conduit or thru treatment plant <br />SAMPLE <br />MEASUREMENT <br />Mal/d <br />g <br />•„••• <br />••-••- <br />•••„• <br />"”" <br />0 <br />Continuos <br />os <br />Instan <br />50050 1 0PERMIT <br />Effluent Gross <br />REQUIREMENT <br />Req. Mon. <br />30DA AVG <br />61 <br />DAILY MX <br />Mga11d <br />...... <br />...,.. <br />Continuous <br />INSTAN <br />Solids, total dissolved <br />SAMPLE <br />MEASUREMENT <br />»..» <br />.»». <br />».»• <br />-•»-- <br />m9/1 <br />0 <br />Quartlarly <br />Grab <br />7029510 <br />Effluent Gross <br />PERMIT <br />REQUIREMENT <br />...». <br />».... <br />QRejR on- <br />eeqq,, <br />DAILY MX <br />m92 <br />Quarters y <br />GRAB <br />NAME/TITLE PRINCIPAL EXECUTIVE OFFICERe,v;,p„mew,d,yy�propaTELEPHONE DATE <br />wAi tf—f —wbm deaselmm rme� p-- Plhv and <br />r2ftr a a—aw=aa+w aaoageda <br />mem, those Ip dastiY ��Nc � �� the aranan an me a tamatm wbmmd a, <br />Scott Wanstedt, Environmental Engineer,„ ,��;�of,m ��,� �.: vo�v(970) 675-4322 10/22/2018 <br />vphtaax SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR <br />TYPED OR PRINTED AUTHORIZED AGENT AREA Co" NUMBER MM/DWYYY <br />COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here) <br />TSS & TOTAL IRON LIMITS WILL BE WAIVED FOR 10YR,24HR PRECIP. EVENT - SEE I.A.1, PG. 3. FOR REQUIREMENTS. OIL & GREASE REPORTING - I.B.1.A.,PG. 13. QRTRLY SAMPLING INSTRUCTIONS - I. C. 7., PG. 14. <br />EPA Form 3320-1 (Rev.01106) Previous editions may be used. f 05/7112011 Page 1 <br />