room to place plant growth material on the final pit slopes and perform seedbed <br />preparation and final seeding. <br />Since the final pit slope will be mined at 3H:1 V, there will be no need to have heavy <br />earth moving equipment on the 3H:1 V final slopes to place backfill. Topsoil may be <br />placed midway on the slopes undergoing reclamation by pushing uphill and back <br />dragging the topsoil downhill. <br />All final reclamation operations (Seedbed preparation, fertilizer application and seeding) <br />will be on the contour as long as it can be done without endangering the reclamation <br />equipment and equipment operator. <br />9) Under section (2), the applicant proposes a reclamation bond in the amount of <br />$67,375.00 ($2,500 per acre for a total of 26.95 acres). Pursuant to rule 4.2.4(1), <br />the financial warrantyfor a 111 Special Operation Permit shall be in the amount <br />Of not less than $2,500. 00 per acre of affected land. However, the Division may <br />require such other greater amount necessary to ensure that estimated costs of <br />reclamation are assured. In this case, the Division has identified adequacy items <br />above regarding the proposed pit depth, importation of topsoil, and potential <br />importation of backfill material that, depending on the applicant's response, may <br />require a greater bond amount than that proposed to ensure reclamation costs <br />are assured. Please provide a cost estimate that includes all costs for completing <br />the proposed reclamation plan. The estimate should include costsfor importing <br />topsoil, and if needed, backfill material to the site. <br />Response: <br />• Backfilling Cost: We do not intend to backfill the final pit highwalls since the final <br />pit slopes will be mined at 3H: IV. <br />• Estimated site Reclamation costs: <br />Task <br />Quantity <br />Units <br />Unit cost <br />Total <br />PGM placementi <br />6,454 c ds <br />c ds <br />$1.55.-cyd <br />$10,004.00 <br />Deep disk <br />subsoil <br />26.95 acres <br />acres <br />122.40.:acre <br />$3,299.00 <br />Manures <br />26.95 acres <br />.4-.5 t. acre <br />$260.001acre <br />$7,007.00 <br />Other <br />Amendments2 <br />26.95 acres <br />acres <br />$153.00'acre <br />Seedbed Prep. <br />26.95 acres <br />acres <br />$122.40/acre <br />$3,299.00 <br />Drill Seedin 3 <br />26.95 acres <br />I acres <br />I $349.94/acre <br />$9,431.00 <br />Weed Controls <br />5.39 acres <br />200 o of area <br />S235. 10 'acre <br />$2,534.00 <br />Total: <br />$35.574.00 <br />1. Plant growth material (PGM) <br />