My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_PERMIT FILE - C1981038 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-03-30_PERMIT FILE - C1981038 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 8:00:18 AM
Creation date
10/29/2018 7:57:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
3/30/2018
Section_Exhibit Name
Volume 7 3.05 Bond Requirements Paonia Loadout
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task# 212 Page 1 of2 <br />Task description: <br />Site: Bowie No. 1 Mine <br />BULLDOZER WORK <br />Remove Train Loadout Pond <br />PROJECT IDENTIFICATION <br />Task#: 212 <br />Date: 1/18/2018 <br />User: CCW <br />Permit Action: Bond Release6(SL-6) Permit/Job#: C1981038 <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DIOT - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s hank ripper <br />Shift Bas is: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $122.17 NA <br />Operating Co s t/Hour: $111.29 <br />100 <br />Ripperown. $14.40 <br />NA <br />Cost/Hour: <br />Ripperop. Cost/Hour: $8.25 <br />100 <br />Operator Cost/Hour: $41.85 <br />NA <br />Total unit Cost/Hour: $297.96 <br />Total Fleet Cost/Hour: $1,191.82 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,904 <br />Swell factor: 1.330 <br />Loose volume: 3,862 LCY <br />Source ofestimatedvolume: Permit Vol 1, Page 111; Map 8a-2 <br />Source ofestimated swell CAT Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush 0% <br />gradient: <br />Averages ite altitude: 7,200 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposedrock-50%Rock 50%Earth <br />Job Condition Correction Factor Source <br />Abbreviation: None <br />Filename: C038-212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.