Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 211 Page 1 of2 <br />Task description: <br />Site: Bowie No. l Mne <br />BULLDOZER WORK <br />Remove Coal Stockpile Pond <br />Permit Action: Bond Release 6(SLr6) Permit/Job#: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 211 State <br />Date: 1/18/2018 County <br />User: CCW <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s hank rip per <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown : <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C038-211 <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$14.40 <br />NA <br />$8.25 <br />100 <br />$41.85 <br />NA <br />Totalunit Cost/Hour: $297.96 <br />Total Fleet Cost/Hour: $1,191.82 <br />MATERIAL QUANTITIES <br />Initial Volume: 565 <br />Swell factor: 1.330 <br />Loose volume: 751 L.CY <br />Source of estimatedvolume: <br />Source ofestimatedswell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Permit Vol 1, Page 35 <br />CAT Handbook <br />50 feet <br />2,748.7 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush 0% <br />gradient: <br />Averages ite altitude: 7,200 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decompo sed rock -50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />