Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 207 Page 1 of2 <br />Task description: <br />Site: Bowie No. 1 Mne <br />BULLDOZER WORK <br />Grade Railroad Spur <br />Pennit Action: Bond Release 6 (SL -6) Permit/Job#: C1981038 <br />PROJECT IDENTIFICATION <br />Task#: 207 State: Colorado <br />Date: 1/18/2018 County: Delta <br />User: CCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatDIOT - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s hank ripper <br />Shift Bas is: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C038-207 <br />ILVA /rYIlnVol I /11f.10I IYYI�.y <br />Initial Volume: 113,504 <br />Swell factor: 1.330 <br />Loose volume: 150,960 LCY <br />Source ofestimatedvolume: 1988 Cyprus Estimate <br />Source ofestimated swell CATHandbook <br />factor: <br />19 11:7 %,a Wtie) 1111O[I],I <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -10% <br />gradient: <br />Average site altitude: 6,500 feet <br />Mate ria l w e i g h t: 2,900 lbs / LCY <br />Weight description: Decomposed rock -50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Utilization % <br />Ownership Cost/Hour: <br />$122.17 <br />NA <br />Operating Cost/Hour: <br />$111.29 <br />100 <br />Ripper own. <br />$14.40 <br />NA <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />$8.25 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $297.96 <br />Total Fleet Cost/Hour: $1,191.82 <br />ILVA /rYIlnVol I /11f.10I IYYI�.y <br />Initial Volume: 113,504 <br />Swell factor: 1.330 <br />Loose volume: 150,960 LCY <br />Source ofestimatedvolume: 1988 Cyprus Estimate <br />Source ofestimated swell CATHandbook <br />factor: <br />19 11:7 %,a Wtie) 1111O[I],I <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -10% <br />gradient: <br />Average site altitude: 6,500 feet <br />Mate ria l w e i g h t: 2,900 lbs / LCY <br />Weight description: Decomposed rock -50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />