Laserfiche WebLink
Bulldozer Worksheet Cont'd Task# 206 Page 1 of2 <br />Task description: <br />Site: Bowie No. 1 Mne <br />BULLDOZER WORK <br />Excavation/Grading at Storage Area and Loadout <br />PemutAction: Bond Release6(SL-6) Permit/Job#: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: <br />206 <br />Date: <br />1/18/2018 <br />User: <br />CCW <br />State: Colorado <br />County: Delta <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatDIOT - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s hank ripper <br />Shift Bas is: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C038-206 <br />MATERIAL QUANTITIES <br />Initial Volume: 23,232 <br />Swell factor: 1.165 <br />Loose volume: 27,065 LCY <br />Source ofestimatedvolume: Permit Vol 1, Page 60 <br />Source ofestimatedswell CATHandbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 400 feet <br />Unadjusted hourly 497.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -5% <br />gradient: <br />Averages ite altitude: 7,000 feet <br />Material weight: 2,9001bs /LCY <br />Weight description: Decomposedrock-50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Utilization % <br />Ownership Cost/Hour: <br />$122.17 <br />NA <br />Operating Cost/Hour: <br />$111.29 <br />100 <br />Ripper own. <br />$14.40 <br />NA <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />$8.25 1 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $297.96 <br />Total Fleet Cost/Hour: $1,191.82 <br />MATERIAL QUANTITIES <br />Initial Volume: 23,232 <br />Swell factor: 1.165 <br />Loose volume: 27,065 LCY <br />Source ofestimatedvolume: Permit Vol 1, Page 60 <br />Source ofestimatedswell CATHandbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 400 feet <br />Unadjusted hourly 497.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush -5% <br />gradient: <br />Averages ite altitude: 7,000 feet <br />Material weight: 2,9001bs /LCY <br />Weight description: Decomposedrock-50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />