My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_PERMIT FILE - C1981038 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-03-30_PERMIT FILE - C1981038 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 8:00:18 AM
Creation date
10/29/2018 7:57:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
3/30/2018
Section_Exhibit Name
Volume 7 3.05 Bond Requirements Paonia Loadout
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/L.oader Worksheet Cont'd Task # 204 Page 4 of4 <br />Haul Route: <br />Seg# <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />(%) (%) <br />NO <br />NO <br />(fpm) <br />Time <br />LCY/Hour Adjusted forjob efficiency: <br />914.22 LCY/Hour <br />mlri <br />min <br />1 <br />1 21120.00 <br />0.00 <br />3.00 <br />1 3.00 <br />1 2983 <br />7.643 <br />Haul Time: 7.643 minutes <br />Return Route: <br />CIRCES Cost Estimating Sodware <br />Seg# <br />HaulDistance Grade (%) <br />Roll. Res Total Res <br />Velocityrave <br />Total Truck Cycle Time: 17.264 <br />minutes <br />(Ft) <br />(%) (%) <br />(fpm) I Time <br />Production <br />1,101.46 <br />LCY/Hour Adjusted forjob efficiency: <br />914.22 LCY/Hour <br />mlri <br />1 <br />21120.00 0.00 <br />3.00 3.00 <br />3569 1 6.131 <br />CIRCES Cost Estimating Sodware <br />Return Time: 6.131 <br />minutes <br />Total Truck Cycle Time: 17.264 <br />minutes <br />Loading Toolunit <br />Production <br />1,101.46 <br />LCY/Hour Adjusted forjob efficiency: <br />914.22 LCY/Hour <br />Truck Unit Production <br />152.48 <br />LCY/Hour Adjustedfor job efficiency: <br />126.56 LCY/Hour <br />Optimal No. of Trucks: <br />7 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjustedhourly truck team production: 506.25 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 506.25 <br />L.CY/Hour <br />A djus ted multiple truck/loader team production: 506.25 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet s ize: <br />1 <br />Team(s) Total job time: 4.37 <br />Hours <br />Unit cost: <br />$3.611 <br />/LCY Totaljob cost: $7,979 <br />CIRCES Cost Estimating Sodware <br />
The URL can be used to link to this page
Your browser does not support the video tag.