My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-03-30_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2021 12:56:32 PM
Creation date
10/29/2018 7:52:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
3/30/2018
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
area, to use vegetative buffers or straw dikes for erosion and <br />sediment control. <br />(ii) Surface and groundwater treatment plan. <br />All surface drainage from disturbed lands is routed through <br />sedimentation facilities. These facilities are monitored and <br />maintained in accordance with 2.05.3(3)(c), Operations Plan, <br />Existing Structures, and will remain so until the disturbed area <br />has been restored. <br />The sedimentation facilities have been designed and <br />constructed to store a precipitation event equal to a 10 -year, <br />24-hour storm. The design storm will be detained a minimum <br />of 24 hours. <br />In most cases, no treatment other than a 24-hour detention <br />time, allowing sediment to settle out, is needed for discharges <br />from the train loadout sediment pond or the stockpile sediment <br />pond to meet state and federal water quality standards. Should <br />treatment be necessary, the water may be retained in the <br />ponds and material, such as flocculent, added to bring the <br />discharge into compliance with NPDES requirements. Water <br />discharged from these ponds is sampled and sent for <br />laboratory analysis. Reports are submitted quarterly to the <br />regulatory authority. <br />Small Area Exemptions <br />As stipulated in Rule 4.05.2(3)(a)(b) the Division may grant <br />exemptions from Rule 4.05.2(1) which states "All surface <br />drainage from the disturbed area, including disturbed areas <br />that have been graded, seeded, or planted, shall be passed <br />through a sedimentation pond, a series of sedimentation <br />ponds, or a treatment facility before leaving the permit area." If <br />the operator demonstrates that sedimentation ponds are not <br />necessary for the drainage to meet the effluent limitation of <br />RN -07 2.05-39 03/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.