Laserfiche WebLink
12. Coal Stockpile Area: Excess material placed in the coal stockpile area <br />will be graded to a smooth uniform surface. Some of the excess <br />material will be stockpiled to be used to fill the Black Bridge Road <br />Culvert and for use in filling the sediment pond. The regraded areas will <br />be seeded and mulched. (3 weeks) <br />13. Black Bridge Road Culvert: The large multi -plate culvert will be filled <br />with compacted soil. (2 weeks) <br />14. Sediment Ponds: The sediment ponds will be reclaimed after vegetation <br />has been established and DRMS has approved their removal. (2 weeks) <br />15. Loadout Wells: The three loadout wells will be sealed. (1 week) <br />(b) Cost estimate for the reclamation with calculations. <br />A detailed estimate of the cost of reclamation of the proposed mine and mine <br />facilities is presented in Section 3.05 Performance Bond Requirements. <br />(c) A plan for backfilling, soil stabilizing, compacting, and grading. <br />The mine loadout area was constructed using approximate balanced cut and <br />fill technique. To reclaim the areas to approximate original contour, the fill <br />placed on the outslopes must be returned to the cut slopes. The Postminig <br />Topography Map No. 8A shows the final contours of the land. <br />(d) A plan for removal, storage and redistribution of topsoil. <br />The site construction occurred before rules requiring the salvage of <br />topsoil were promulgated. Available topsoil will be re -distributed over <br />the re-contoured site. <br />RN -07 2.05-25 03/18 <br />