Laserfiche WebLink
f <br /> f � <br /> Mr. Russel A. Larson <br /> Page 2 <br /> November 28, 2016 <br /> 6) Per Rule 6.4.4(h)(i), due to the likely potential for use of explosives to blast the <br /> material the applicant must address the requirements of Rule 6.5(4). <br /> 7) Please clarify what the anticipated total maximum disturbance will be. Will the site be <br /> mined in phases with ongoing interim reclamation? <br /> 8) Per Rule 6.4.6, The Reclamation Map must show the proposed topography of the area <br /> with contour lines of sufficient detail to portray the direction and rate of slope of all <br /> reclaimed lands. The map submitted does not provide enough specific detail of the <br /> proposed final configuration. Please provide a detailed map that portrays the proposed <br /> final configuration. <br /> 9) Per Rule 6.4.13, Will the operation require a dust control permit? If not please explain <br /> reason. <br /> This is a preliminary review. Other issues may arise from other agency comments, and as <br /> more information is supplied. This application cannot be approved until the issues brought <br /> forth are adequately addressed. Please submit a response to the issues as soon as possible, <br /> but no later than October 27, 2018 so the decision due date set for November 7, 2018 can be <br /> met. If your response or a written extension request are not received by October 27, 2018 <br /> this application may be denied. <br /> If you need additional information, please contact me at the Division of Reclamation, Mining <br /> and Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado <br /> 81501, telephone no. 970.241.2042. <br /> Sincerely, <br /> Travis Marshall <br /> Environmental Protection Specialist <br /> ec: Wally Erickson, DRMS <br />