Laserfiche WebLink
Page 72 of 115 <br />BULLDOZER WORK <br />Task description: Regrade Topsoil for Ditch D5 <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 035 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPNIINT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C019-035 <br />Totalunit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,727 <br />Swell factor: 1.000 <br />Loose volume: 1,727 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Totalunit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,727 <br />Swell factor: 1.000 <br />Loose volume: 1,727 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />50 feet <br />Unadjusted hourly <br />4,589.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />0% <br />gradient: <br />Averages ite altitude: <br />7,500 feet <br />Material weight: <br />2,550 lbs/LCY <br />Weight description: <br />Earth -Dry packed <br />CIRCES Cost Estimating So$ware <br />