Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Topsoil for Ditch D2 <br />Site: Colowyo Coal Mne <br />PROJECT IDENTIFICATION <br />Permit Action: 13C (RN7) <br />Page 66 of 115 <br />Permit/Job#: C1981019 <br />Task#: 032 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-032 <br />Us er: ZTT <br />Ag ency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />CatDI1T - 11U <br />850 <br />Universal <br />NA <br />1 perday <br />(CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,772 <br />Swell factor: 1.000 <br />Loose volume: 2,772 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepushdistance: 50 feet <br />Unadjusted hourly 4,589.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush 0% <br />gradient: <br />Averages ite altitude: 7,500 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating So$ware <br />