Laserfiche WebLink
Page 64 of 115 <br />BULLDOZER WORK <br />Task description: Regrade Topsoil for Ditch D1 <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: <br />031 <br />Date: <br />5/16/2018 <br />User: <br />ZTT <br />State: Colorado Abbreviation: None <br />County: Moffat Filename: C019-031 <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />CatDllT - 11U <br />850 <br />Universal <br />NA <br />1 perday <br />(CRG) <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripperown. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />111aUlf y <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 602 <br />Swell factor: 1.000 <br />Loose volume: 602 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 4,589.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fillorembankment 0.9 <br />Averagepush <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 602 <br />Swell factor: 1.000 <br />Loose volume: 602 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 4,589.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fillorembankment 0.9 <br />Averagepush <br />0% <br />gradient: <br />Average site altitude: <br />7,500 feet <br />Material weight: <br />2,550 lbs/LCY <br />Weight description: <br />Earth - Dry packed <br />CIRCES Cost Estimating SoSwaie <br />