Laserfiche WebLink
Page 50 of 115 <br />BULLDOZER WORK <br />Task description: Wilson StoragePondRemoral <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 024 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripperown. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C019-024 <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,127 <br />Swell factor: 1.000 <br />Loose volume: 16,127 LCY <br />Source ofestimatedvolume: Edi 7,Item 23,Fig. C5 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepushdistance: 120 feet <br />Unadjusted hourly 2,467.4 LCY/hr <br />production: <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush -15% <br />gradient: <br />Averages ite altitude: 6,900 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposedrock-25%Rock, 75% Earth <br />CIRCES Cost Estimating Soiware <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,127 <br />Swell factor: 1.000 <br />Loose volume: 16,127 LCY <br />Source ofestimatedvolume: Edi 7,Item 23,Fig. C5 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepushdistance: 120 feet <br />Unadjusted hourly 2,467.4 LCY/hr <br />production: <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush -15% <br />gradient: <br />Averages ite altitude: 6,900 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposedrock-25%Rock, 75% Earth <br />CIRCES Cost Estimating Soiware <br />