Laserfiche WebLink
Page 48 of 115 <br />I kIJ 00016YA�I:iiil�]:i;� <br />Task description: Temporary Facilities PondRemoval <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 023 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-023 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating CosbHour: <br />Ripperown. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,538 <br />Swell factor: 1.000 <br />Loose volume: 4,538 LCY <br />Source ofestimatedvolume: Fadi 7,Item 23,Fig. C5 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />120 feet <br />2,467.4 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sotware <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,538 <br />Swell factor: 1.000 <br />Loose volume: 4,538 LCY <br />Source ofestimatedvolume: Fadi 7,Item 23,Fig. C5 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />120 feet <br />2,467.4 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sotware <br />