My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-15_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-05-15_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 8:32:09 AM
Creation date
10/25/2018 8:26:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/15/2018
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Sidehill Pond Removal <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) <br />PROJECT IDENTIFICATION <br />Task#: 021 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatDllT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />ShiftBasis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 44 of 115 <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 19,800 <br />Swell factor: 1.125 <br />Loose volume: 22,275 LCY <br />Source ofestimatedvolume: Exh 7,Item 23,Fig. C5 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />120 feet <br />2,467.4 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposed rock -25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 19,800 <br />Swell factor: 1.125 <br />Loose volume: 22,275 LCY <br />Source ofestimatedvolume: Exh 7,Item 23,Fig. C5 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />120 feet <br />2,467.4 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposed rock -25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.