Laserfiche WebLink
BULLDOZER WORK <br />Task description: Section26 Pond Removal <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Page 42 of 115 <br />Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />Task#: 020 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organizationname: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CatD11T - llU <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 perday <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />Utilization % <br />$226.13 NA <br />$183.90 100 <br />$0.00 I NA <br />$41.85 1 NA <br />MATERIAL QUANTITIES <br />Initial Volume: 10,400 <br />Swell factor: 1.125 <br />Loose volume: 11,700 LCY <br />Source o fes timated vo lume: Exh 7,Item 23,Fig. C6 <br />Source o f e s timated s well Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />120 feet <br />2,467.4 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Material weight: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock -25% Rock, 75% Earth <br />Abbreviation: None <br />Filename: C <br />CIRCES Cost Estimatmg Solware <br />