My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-15_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-05-15_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 8:32:09 AM
Creation date
10/25/2018 8:26:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/15/2018
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition CorrectionFactor <br />Source <br />Operator Skill: <br />1.000 <br />EXCL.) <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />(AVG <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DA <br />Spoil pile: <br />0.900 <br />(SSD -FC) <br />Push gradient <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5836 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,498.74 LCY/hr <br />1498.74 LCY/hr <br />Fleetsize: 1 Dozer(s) <br />Unit cost: 0.302/LCY <br />Totaljob time <br />Totaljob cost <br />4.95 Hours <br />$2,239 <br />Page 39 of 115 <br />CIRCES Cost Estimatmg So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.