Laserfiche WebLink
Page 89 of 115 <br />Saltbush, Four Wing <br />Units <br />Cost/Acre <br />Estimated Failure Rate: <br />Snowberry, Mountain <br />0.75 <br />1.29 <br />$37.88 <br />Penstemon, Rocky Mountain <br />0.25 <br />3.92 <br />$7.38 <br />Yarrow, Western <br />0.10 <br />6.08 <br />$4.18 <br />Job Hours: <br />Totals Seed Mix 12.00 <br />74.80 <br />141.03 <br />icauon <br />Description Cost/Acre <br />$0.00 <br />Total Seed Application Cost/Acre 0.00 <br />MULCHING and MISCELLANEOUS <br />Materials <br />iicanon <br />Units <br />Cost/Acre <br />Estimated Failure Rate: <br />Totals Nursery Stock Cost/ Acre 0.00 <br />Description <br />Acre <br />Unit <br />Cost/ Unit <br />Cost/Acre <br />Reseeding Job Cost: <br />$922.34 <br />TotalJob Cost: <br />$9,010 <br />Total Mulch Materials Cost/Acre <br />Job Hours: <br />16.00 <br />0.00 <br />iicanon <br />Description <br />Cost/Acre <br />Estimated Failure Rate: <br />Totals Nursery Stock Cost/ Acre 0.00 <br />Total Mulch Application Cost/Acre <br />0.00 <br />NURSERY STOCK PLANTING <br />No Type and Size Planting <br />Common Name Acre Cost <br />Fertilizer <br />Pellet Cost Cost/Acre <br />32.7 <br />Estimated Failure Rate: <br />Totals Nursery Stock Cost/ Acre 0.00 <br />JOB TIME AND COST <br />Cost/Acre: $247.32 <br />Cost /Acre*: $141.03 <br />CIRCES Cost Estimating So$ware <br />No. ofAcres: <br />32.7 <br />Estimated Failure Rate: <br />20% <br />*Selected Replanting Work Items: <br />SEEDING <br />Initial Job Cost: <br />$8,087.36 <br />Reseeding Job Cost: <br />$922.34 <br />TotalJob Cost: <br />$9,010 <br />Job Hours: <br />16.00 <br />Cost/Acre: $247.32 <br />Cost /Acre*: $141.03 <br />CIRCES Cost Estimating So$ware <br />