Laserfiche WebLink
Page 86 of 115 <br />110%00116YA91MINT )A <br />Task description: Regrade Topsoil for Tie -In Road Access Road <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 042 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-042 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis : <br />Data Source: <br />Cost Breakdown: <br />CatD11T - 11U <br />850 <br />Universal <br />NA <br />1 perday <br />(CRG) <br />MATERIAL QUANTITIES <br />Initial Volume: 1,071 <br />Swell factor: 1.000 <br />Loose volume: 1,071 LCI' <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Edi. 7 -item 23, Fig. B-1 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush dis tance: <br />Unadjusted hourly <br />production: <br />200 feet <br />1,560.0 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Material weight: <br />Weight description: <br />-5% <br />7,500 feet <br />2,550 lbs /LCY <br />Earth - Dry packed <br />CIRCES Cost Estimatmg SoYware <br />Utilization % <br />Ownership Cost/Hour: <br />$226.13 <br />NA <br />Operating Cost/Hour: <br />$183.90 <br />100 <br />Ripperown. <br />$0.00 <br />NA <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unitCost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,071 <br />Swell factor: 1.000 <br />Loose volume: 1,071 LCI' <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Edi. 7 -item 23, Fig. B-1 <br />Source ofestimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush dis tance: <br />Unadjusted hourly <br />production: <br />200 feet <br />1,560.0 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Material weight: <br />Weight description: <br />-5% <br />7,500 feet <br />2,550 lbs /LCY <br />Earth - Dry packed <br />CIRCES Cost Estimatmg SoYware <br />