7l. 2 _ 1
<br /> Operator Name: McFarland Enterprises, Inc. EXHIBIT C Site Name: Hobo Mine 2
<br /> Permit Boundary & Mine Plan Map
<br /> Located in the NE1/4 and the NW1/4 of Section 17, in suspended T. 42 N., R. 6 W.,
<br /> New Mexico Principal Meridian, San Juan County, Colorado
<br /> Control Monument#1 p
<br /> Comer 2,MS 16097 Hobo 0
<br /> N
<br /> s �c
<br /> Control Monument#2
<br /> / Comer 7,Ms
<br /> 14916 Queen
<br /> LEGEND gg
<br /> %
<br /> 8� % I
<br /> C 0 2yz"aluminum cap on a#6 rebu•LS 26597 � � i C
<br /> P.O.B Point of beginning
<br /> /
<br /> o
<br /> 240.00'
<br /> III \ S P.O.B
<br /> 8 g
<br /> $ Contour's shown are one(1)foot interpolation.
<br /> I
<br /> Legal Descryion Permit area Hobo 2 mine
<br /> B Basis of Beating B
<br /> The beating between corner 2,MS 16097 Hobo monumented with a 2h"aluminum cap on a#6 rebar,by LS 26597 and corner 7,MS 14916 Queen monumenled
<br /> with a 21/V aluminum cap on a#6 rebar,by LS 26697 was found to bear S.13"24'47'W.
<br /> Beginning at a point whence corner 7.MS 14916 Queen bears N.WWI E.,269.67 ft.dist.;thence N.20"16'31"W.,121.66 ft..dist.;thence N.2004658"E.,12.97
<br /> ft.,dist.:thence N.22"36'49"E.,25.22 ft..dist.;thence N.18"40'57"E.,32.35 ft.,dist.;thence N.24"31'38"E.,33.65 ft.,dist.;thence N.27'36105"E.,29.69 ft.,dist.;
<br /> thence N.2902T 14"E.,28.08 ft.,dlst,;thence N.33'57'29"E.,25.88 ft.,dist.;thence N.33"33'59"E.,29.73 ft.,dial.;thence N.13"32'02"E.,63.24 ft.,chat.;thence N.
<br /> 29"59'50"E.,41.75 ft.,Met.:thence N.43'48'55"E.,22.92 ft.,dist.;thence N.32"51'29"E.,12.89 ft.,dist.;thence N.27"05'54"E.,13.92 ft.,dist.;thence N.37*24'13"
<br /> E.,9.72 ft.,dist.;thence N.48`06'30"E.,12.71 ft.,dist.;thence N.62"2T39"E.,7.36 ft.,dist.;thence N.65*1955"E.,8.56 ft.,dist.;thence N.WNW'E.,5.92 ft.,
<br /> dist.;thence S.72'02'52"E.,7.68 ft.,diet.;thence S.52°22'14"E.,15.07 ft.,dist.;thence S.65"04'10"E.,17.07 ft.,dist.;thence S.59"00'21"E.,6.29 ft.,dist.;thence
<br /> S.08"38'25"E.,5.35 ft.,dist.;thence S.13"3T32"W.,19.38 ft.,diet.;thence S.05"49'26"W.,17.74 ft.,dist.;thence S.04"23'24"E.,14.11 it.,dial.;thence S.
<br /> 36°03'43"E.,13.01 ft.,dist.;thence N.53'56'17"E..18.00 ft.,dist.;thence N.36°03'43"W.,7.90 ft.,dist.;thence N.04'23'24"W.,7.39 ft.,dist.;thence N.05"49'26"
<br /> E.,14.90 ft.,dist.;thence N.13°37'32"E.,21.70 ft.,dist.;thence N.08"38'25"W.,17.36 ft.,dist.;thence N.59'00'21"W..15.71 ft.,dist.;thence N.65°04'16'W.,
<br /> 16.02 ft.,dist.;thence N.52"2714"W.,16.19 ft.,dist.;thence N.72'02'52"W.,14.32 ft.,dist.;thence S.85'50'46'W.,12.72 ft.,dist.;thence S.63°5T23"W.,22.32
<br /> ft.,dist.;thence S.48"06'30"W.,W.I.,dial.;thence S.37"24'13"W..13.03 ft.,dist.;thence S.27°05'54"W.,14.63 ft.,dist.;thence S.32°51'29"W.,10Z ft..dist.:
<br /> (hence S.43°48'55"W.,23.38 ft.,dial.;thence S.29'59'50'W.,46.53 ft.,dist.;thence S.13"3702"W.,62.66 ft.,dist.;thence S.33`33'59"W.,28.49 ft.,dist.;thence
<br /> S.33"57*29"W.,26.54 ft.,dist.;thence S.29"2T14"W.,29.08 ft.,dist.;thence S.27"36'05"W.,30.45 ft.,dist.;thence S.24"31'38"W.,35.05 ft.,dist.:thence S.
<br /> 18"40'57"W.,32.66 ft.,dist.;thence S.22"36'49"W.,17.74 ft.,dist.;thence N.20"16'31"W.,6.37 ft.,dist.;thence S.55"00'00"W.,161.86 ft.,dist.;thence S.
<br /> 35°00'00"E.,150.00 ft.,dist.;thence N.55"00'00"E.,122.44 ft..dial.;to the point of beginning.Containing 0.713 acres
<br /> 1.Proposed start date for mining activates August 30,2018. ai
<br /> 2.Proposed ending date September 30,2028
<br /> 3.An eighteen(18)inch safety berm will be constructed around the existing pad area.
<br /> 5.Storm water control devises such as water bars or drainage ditches will be installed and maintained on the existing road.
<br /> 4.Production will be seasonal and minimal.Removal of less than 5oo lbs.of target material each season.Season will depend on
<br /> access due to snow and conditions.Generally sometime between June and August.Removal of the stone will be done with the use of
<br /> a jack-leg and the use of a non-Explosive Demolition Agent. IE:Expanding Grout. Holes will be drilled at a depth to provide the most O RT H
<br /> efficient use of this product.Holes will be approximately 1 5/8 inch diameter.The material will be hand sorted.Material will be hauled
<br /> on an existing road with an OHV.Material will not be stored on site.Material will be cut and processed off site. OC�o
<br /> Equipment:
<br /> Toyo 65#Jackleg.
<br /> Rented compressor.
<br /> Polaris ranger(Surface use only). 0r 80' 160'
<br /> A Note: SCALE.' P-80r A
<br /> 1.Mining operation will not directly affect surface or ground water systems.
<br /> ro98J 3890fieD
<br /> 14CResources LLC 07orev�aeao
<br /> li(ASHtan",f#h4 d.D 81�16 anvil:
<br /> Scnle: Revisions:
<br /> McFarland Enterprises,lnc. Dale:
<br /> 1810 Mineral St. a120118
<br /> L+ �y �p SilvertonColorado
<br /> KES
<br /> 3lgnt1ltae Date Job Number
<br /> 09 10
<br /> se.r 1 o t
<br /> 7 1
<br />
|