Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future (Post-mining)land use (check one): <br /> Cropland(CR) _a Pastureland(PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Mine Portal will be collapsed, little to no backfill is expected. Back slope will be re-graded to work <br /> with existing contours or at a 3HAV. Available top soil will distributed across disturbed area and <br /> rP-cPpdpd_ Fxisting road will ,arrofirp-,and rP-SPPdPd to the private prnnerty line of MS IAM7- Hnhn <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 3 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: I V(example 1 H:1 V, 2H: IV, etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Little to no backfill is expected, grading work to match with existing contours <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> N/A, explain: T-eps •,that is available will, be diStF;pmed acress distur-bed <br />