My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-24_PERMIT FILE - M2018055 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018055
>
2018-10-24_PERMIT FILE - M2018055 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:54:15 AM
Creation date
10/24/2018 2:32:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018055
IBM Index Class Name
Permit File
Doc Date
10/24/2018
Doc Name
Application
From
Eagle Rocks Aggregate
To
DRMS
Email Name
SJM
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L WORST CASE RECLAMATION SCENARIO <br /> The worst case reclamation scenario at the Tower Pit will be once the maximum disturbance area <br /> of 10 acres has been developed. Mining operations will move through the site, staying in the <br /> active area. A truck scale and office trailer will be located near the entrance, and will need to be <br /> removed. A detailed breakdown of reclamation tasks can be seen below. <br /> 1. Reclamation Tasks and Costs <br /> • Remove truck scale and office trailer= $7500. <br /> • Active highwall area knockdown (dozer work)=250 ft of OH:1 V to 2H:1 V slope (cross <br /> section area of 3600 sq. ft) at 27 CF/CY= 33,333 CY at $0.50/CY= $16,667. <br /> • Topsoiling of 10 acres of disturbance at the end of mining (loader work). 10 acres at 12 <br /> inches deep (116,133 CY) at$1.50/CY = $24,200. <br /> • Rangeland seeding and mulching of the maximum disturbed area. 10 acres at $850/acre = <br /> $8500. <br /> Table L-1 Phase 2 Reclamation Task and Cost Estimate <br /> Activity Description Time(Months) Cost($) <br /> Remove truck scale and office trailer 0.5 7500 <br /> Active highwall knockdown 2 16667 <br /> Topsoilings of all disturbed areas 2 24200 <br /> Revegetation of disturbed areas. Includes seeding and mulching. 3 8500 <br /> Subtotal 7.5 $56,867 <br /> DRMS Costs(28%x direct costs) $15,923 <br /> Total Bond Amount $72,790 <br /> The total bond for the Tower Pit will be $72,790. <br /> Tower Pit Greg l.ewicki and Asswiak-s,PIRA' <br /> October 2018 L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.