My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-24_PERMIT FILE - M2018055 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018055
>
2018-10-24_PERMIT FILE - M2018055 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:54:15 AM
Creation date
10/24/2018 2:32:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018055
IBM Index Class Name
Permit File
Doc Date
10/24/2018
Doc Name
Application
From
Eagle Rocks Aggregate
To
DRMS
Email Name
SJM
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D MINING PLAN <br /> 1. General Mining Plan <br /> The property boundary has been surveyed on site and the permit area will be surveyed prior to <br /> any additional acreage site disturbance. Map C-2 shows the mining plan. Mine access will be via <br /> US-6. <br /> The gravel zone is estimated to be roughly 60 feet thick in an alluvial deposit and is overlain by <br /> roughly 5-20 feet of overburden and topped by six to twelve inches of topsoil. Mining operations <br /> are expected to stop at or before a depth of 60 feet roughly at the grade of the highway. Mining <br /> may proceed deeper if the deposit continues, but that is not anticipated at this town. <br /> In general,the site is mined from west to east. Map C-2 shows the configuration of the site <br /> during mining. Map C-2 also shows the configuration of the fully mined out pit as well as the <br /> location of the processing plants, stockpiles and office/shop area. Processing of material will <br /> involve crushing and screening at a minimum. Crushing and screening will take place near to the <br /> active mining highwall, with a loader directly feeding the crusher/screen. Crushed and screened <br /> material is then transported to the facilities area near the site entrance. Portions of this material <br /> are further processed to produce higher value products such as washed rock, asphalt, or concrete. <br /> All products that are not directly loaded into equipment for off-site delivery will be stored in <br /> stockpiles in this facilities area. <br /> The mining will be done contemporaneously with the reclamation. This means that as areas are <br /> mined out completely, they will be graded to the final condition, and then topsoiled and <br /> revegetated according to the reclamation plan. Initially, topsoil will be stripped from an area of <br /> approximately 10 acres in order to create the location for initial facilities and mining. <br /> The depth of mining will be roughly 60 feet. It will be mined in two roughly 30 foot passes. The <br /> first pass will begin with the development of the facilities area. Once roughly 10 acres of ground <br /> have been mined down 30 feet, a second mining pass will begin from the entrance of the site. <br /> The net effect of this method of mining is that the topography of the site will lower twice. <br /> Tower Pit Gnk law cL and lswciatc PI,L( <br /> October 2018 D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.