Laserfiche WebLink
Disturbed and Affected Areas <br /> The number of surface acres affected in the permit area at the time of approval of SL-06, <br /> partial Phase III bond release is tabulated below. The area affected by the No. 1 and No. 3 <br /> Mines is presented on Map D-3-21. <br /> 1. Area affected by mining including angle of draw...........................................407.0 <br /> 2. Current disturbed area (developed water resource area)..................................4.8 <br /> Total ..............................................................................................................411.8 <br /> Reclamation Liability <br /> Phase III reclamation liability for the 4.8 acre Developed Water Resources Area is <br /> comprised of: <br /> a. Approximately 2.98 acres that are between ponds (inter-pond areas) having <br /> no further reclamation obligations because these areas support the <br /> permanent developed water resource area. <br /> b. Approximate 0.98 acres aggregate area of the Long Pond, Pond T-1, Pond T- <br /> 2 and Pond P-9 having no further reclamation obligations because they have <br /> been approved as permanent structures, <br /> C. Approximately 0.23 acres of pipelines that carry underground mine water <br /> from Mine No 1 and Mine No 3 to the Long Pond (including the manhole <br /> valve enclosure near the portal of Mine No 3, having no further reclamation <br /> obligations because they have been approved permanent structures). <br /> d. Approximately 0.7 acres comprised of the refuse pond and the open ditch <br /> from P-9 to the refuse pond. No reclamation obligations for the ditch and <br /> refuse pond since they have been approved as permanent structures, <br /> Permit Renewal 4-ix 07/18 <br />