My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-17_PERMIT FILE - C1981025A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981025
>
2018-09-17_PERMIT FILE - C1981025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:26:47 AM
Creation date
10/24/2018 10:07:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
9/17/2018
Section_Exhibit Name
4.0 Operation and Reclamation Status
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will involve cutting and filling approximately 70,000 cy of material. An <br />as built contour map will be submitted to the Division at the time of a bond <br />reduction request (1"=50, 10'C.I.). <br />The sediment and detention ponds, P-1 through P-9 and the refuse pond, at <br />the mine site will remain in place during the initial phase of final <br />reclamation. Drainage from the regraded areas will be diverted into the <br />three sediment ponds to the maximum extent possible. The collection ditches <br />remaining or being extended for the initial phase of reclamation are shown <br />on Drawings D-4-15 and D-14-16. Small area exemptions are being requested <br />for the No. 1 Mine portal area and the new fan site for the No. 1 Mine. <br />(These areas are shaded on Drawings D-4-15 and 0-4-16). Straw dikes will <br />be installed along the base of these regraded areas until seeding and mulching <br />can be done. The straw mulch in these small area exemptions will be stabilized <br />• <br />by crimping or netting. <br />As part of final reclamation, permanent diversion structures will be installed <br />along the contours shown on Drawing D-4-11. These diversions channels drain <br />runoff from the reclaimed refuse embankment. Drainage from the area above <br />the refuse embankment will continue to flow along the County road, diverted <br />permanently away from the head of the disposal site. <br />0— 4-49a (New 8-14-87) <br />
The URL can be used to link to this page
Your browser does not support the video tag.