Laserfiche WebLink
October 16, 2018 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 5 of 8 <br /> <br />Completed items: <br />Culvert F-4(A); the end of this culvert has been repaired but it needs to be cleared <br /> <br />The Foidel Creek School House does not appear to be affected by the mining operation. The pipeline disturbance <br />area is beginning to grow vegetation. Waste pile was observed with no issues noted. Appears the 3rd lift is almost <br />complete. No ponding on the third lift was present. 14L Borehole was still in process at the time of October <br />inspection. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> <br />Per the operator, the mine will finish moving and shape the topsoil pile above the waste pile this fall. <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br /> <br />Current Permitting Actions: <br /> <br />TR-91Adequacey letter sent, responses received, decision date is 10/29/2018 <br />TR-92 Division found incomplete and has received resubmission of revision application <br />TR-84 Extended Decision Date to 11/21/2018