Laserfiche WebLink
October 17, 2018 C-1996-083/Bowie No. 2 Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 6 of 6 <br /> <br /> Photo 5: Smart ditch undercutting Photo 6: straw wattles anchored on top of <br />This is internal drainage on Gob pile 2 gob pile 2 to slow and direct sheet runoff. <br />All runoff is caught in Pond F <br /> <br /> Photo 7: temporary waterbars cut into top of Photo 8 effective straw wattle dam <br />Gob pile 2 for runoff management in ditch D-D7 on gob pile 4 <br />