My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-22_REVISION - M2008078 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-10-22_REVISION - M2008078 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:32:24 AM
Creation date
10/23/2018 10:03:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
10/22/2018
Doc Name Note
Part 3 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM1
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br /> Page 2 of 67 <br /> Permit No.:COG500000 <br /> TABLE OF CONTENTS <br /> PARTI................................................................................................................................................................................................5 <br /> A. COVERAGE UNDER THIS PERMIT - Process water and stormwater.................................................................................5 <br /> 1. Activities Covered.................................................................................................................................................................5 <br /> 2. Limitations on Coverage.......................................................................................................................................................6 <br /> 3. Chemical addition.................................................................................................................................................................7 <br /> 4. Obtaining and maintaining Authorization under this permit...............................................................................................7 <br /> 5. Transfer of permit coverage.................................................................................................................................................8 <br /> 6. Modifying an existing permit................................................................................................................................................8 <br /> 7. Permit Termination Procedures...........................................................................................................................................9 <br /> B. PERMIT COMPLIANCE - Process water and stormwater...............................................................................................10 <br /> 1. Facilities Operation and Maintenance...............................................................................................................................10 <br /> C. EFFLUENT LIMITATIONS and MONITORING REQUIREMENTS.............................................................................................10 <br /> 1. Process Water Discharge Effluent Limitations...................................................................................................................10 <br /> 2. Stormwater Discharge Effluent Limitations .......................................................................................................................19 <br /> D. WHOLE EFFLUENT TOXICITY(WET)TESTING REQUIREMENTS - Process water and stormwater...................................21 <br /> 1. WET Test Requirements.....................................................................................................................................................22 <br /> 2. Toxicity Reopener...............................................................................................................................................................22 <br /> E. GENERAL MONITORING AND SAMPLING REQUIREMENTS - Process water and Stormwater........................................22 <br /> 1. Monitoring Periods and Monitored outfalls.......................................................................................................................22 <br /> 2. Representative sampling and Monitoring points...............................................................................................................22 <br /> 3. Adverse Weather Conditions..............................................................................................................................................23 <br /> 4. Analytical requirements.....................................................................................................................................................23 <br /> 5. Flow Measuring Device-Process water discharges..........................................................................................................24 <br /> 6. Extra monitoring.................................................................................................................................................................25 <br /> F. REPORTING AND RECORDKEEPING - Process water and stormwater...........................................................................25 <br /> 1. Routine Reporting of data-DMRs.....................................................................................................................................25 <br /> 2. Additional Reporting..........................................................................................................................................................25 <br /> 3. Records...............................................................................................................................................................................25 <br /> 4. Signatory and certification requirements...........................................................................................................................26 <br /> G. CONTROL MEASURES - Stormwater only.....................................................................................................................26 <br /> 1. Installation and implementation specifications.................................................................................................................26 <br /> 2. Maintenance of Control Measures and Associated Documentation.................................................................................27 <br /> H. GENERAL MONITORING REQUIREMENTS - Stormwater only.......................................................................................27 <br /> 1. Substantially identical outfalls............................................................................................................................................27 <br /> 2. Measurable storm events and Delayed release of stormwater.........................................................................................27 <br /> 3. Storm event information....................................................................................................................................................27 <br /> 4. Sample Type and Requirements.........................................................................................................................................28 <br /> 5. Climates with Irregular Stormwater Runoff.......................................................................................................................28 <br /> 6. Monitoring for allowable non-stormwater discharges......................................................................................................28 <br /> 7. Monitoring Exceptions for Inactive and Unstaffed Sites....................................................................................................28 <br /> 8. Monitoring Exceptions for Completed and Finally Stabilized Areas...................................................................................29 <br /> 9. Revocation of Monitoring Exception..................................................................................................................................29 <br /> I. SPECIFIC MONITORING REQUIREMENTS - Stormwater only.........................................................................................29 <br /> 1. Visual Monitoring...............................................................................................................................................................29 <br /> 2. Benchmark Monitoring.......................................................................................................................................................30 <br /> 3. Water Quality Standards Monitoring.................................................................................................................................31 <br /> 4. Additional Monitoring Required by the Division................................................................................................................31 <br /> J. FACILITY INSPECTIONS - Stormwater only....................................................................................................................32 <br /> 1. Inspection frequency and personnel..................................................................................................................................32 <br /> 2. Inspection scope.................................................................................................................................................................32 <br /> 3. Inspection documentation.................................................................................................................................................32 <br /> 4. Inspection frequency exceptions for Inactive and Unstaffed Sites....................................................................................33 <br /> 5. Runoff event inspection exception at Completed and Finally Stabilized Areas.................................................................33 <br /> 6. Non-compliance discovered during inspection..................................................................................................................34 <br /> K. CORRECTIVE ACTIONS - Stormwater only....................................................................................................................34 <br /> 1. Conditions that must be eliminated...................................................................................................................................34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.