My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-22_REVISION - M2008078 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-10-22_REVISION - M2008078 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:32:24 AM
Creation date
10/23/2018 10:03:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
10/22/2018
Doc Name Note
Part 3 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM1
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 <br /> Page 12 of 67 <br /> Permit No.:COG500000 <br /> Note 4: Total Flow — Total flow is the cumulative flow of the discharge for the quarter or month in million gallons. If <br /> continuous flow monitoring is not conducted, the permittee must calculate the total flow for the month or quarter using the <br /> 30-day average flow(measured)and the number of days the facility discharged within the month or quarter. <br /> Note 5:Total Dissolved Solids(TDS)—Analysis for salinity,measured as TDS,and a requirement to report quarterly total <br /> flow will be included in the permit certification for all discharges to the Colorado River Basin. <br /> Note 6:Total Phosphorus—Analysis for Total Phosphorus,as P,will be included in the permit certification for all discharges <br /> to waters with a control regulation for P. Monitoring requirements and effluent limitations vary depending on the <br /> applicable control regulation(Regulations 71 through 74). <br /> Note 7: Selenium Loading Calculation--To determine selenium loading values,use the calculation formula below: <br /> Loading in Ibs/day=(30 day average effluent flow in MGD x 30 day average selenium concentration in mg/1)x 8.34 <br /> 1000 ug/I=1 mg/I <br />
The URL can be used to link to this page
Your browser does not support the video tag.