Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) D Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> �✓ Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one): <br /> ✓� Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Excavation by excavator or loader taken to processing area via haul truck or conveyor <br /> 15. On Site Processing: _Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> On-site crushing/screening fed by loader <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Adjusting and expanding permit boundary to include conveyor area, and product storage and <br /> loadout area. Reducing actual mined area. <br />