Laserfiche WebLink
All local, State, and Federal rules and regulations will be followed for the storage and handling <br /> of any fuel for the facilities. <br /> Mine Phasinq <br /> Prowers Aggregate Operators, LLC anticipates mining and reclaiming the West Farm Pit site in <br /> 17 phases, progressing through the phases as shown on the Mining Plan Map. The overall time <br /> required to complete the mining and reclamation is estimated to be 15 to 30 years. Initial <br /> production is expected to be 500,000 tons per year with a possible maximum future production <br /> rate of 1,500,000 tons per year. However, it is possible that due to demand fluctuations, mining <br /> could progress slower than anticipated and additional time may be required for mining and <br /> reclamation of the site. <br /> Prower <br /> UT Consulting,Inc. West Farm PitOperators, <br /> M-2008-0 8 <br /> �' DRMS 112 Permit Amendment Application <br />